Brega Oil Company

Brega Oil Company has successfully repaired critical corrosion in two key pipelines—10-inch and 16-inch—linking Zawiya to Tripoli, preventing a potential disruption in oil flow.

The company reported that corrosion in the 16-inch pipeline had reached 52%, raising concerns over production continuity. Inspections revealed significant internal damage, with pipe thickness decreasing from 6.35mm to just 2.7mm. Engineers also identified 117 additional corrosion points along a five-meter section.

Brega deployed advanced repair techniques and high-quality materials to restore the pipeline, completing the work without halting operations.

The company emphasized that this effort underscores its commitment to maintaining infrastructure integrity and ensuring stable energy supply.

Economy